HomeProperty PracticePlanning and building control

Property Practice · FLK2

Planning and building control: SQE1 notes and practice questions

Key rules, exam traps and 12 single best answer questions on planning and building control, with the answer explained and the law behind each one.

  • 3,641 SQE1 questions across all 14 subjects, in the exam's single best answer format
  • Reviewed by a team of qualified solicitors, with the case or statute behind every answer
  • Full 85-question FLK1 and FLK2 timed mocks, built for the January 2027 format
  • Progress tracked topic by topic, so you revise what you actually get wrong
  • Start free: all notes and guides plus a sample question in every topic, no card needed
  • Solicitor-reviewed questions
  • Law cited on every answer
  • One-off payment, no auto-renewal
  • Secure Stripe checkout
Full SQE1 question bank
from£35£35 £24.50one-off
Black Friday: 30% off, up to 80% on bigger basketsUnlock all 3,641 questions

No auto-renewal · instant access · or try free sample questions

Revision notes

At a glanceIs an unauthorised change at risk of enforcement?
  1. 1Is it operational development or a material change of use?
    YesIt is development and needs permission unless permitted development applies.NoNot development, e.g. internal works or a change within the same use class (shop to café in Class E).
  2. 2Is it unauthorised works to a listed building?
    YesNo time limit; a criminal offence, and the buyer inherits enforcement.NoApply the s 171B enforcement time limits.
  3. 3Was operational development substantially completed before 25 April 2024?
    YesFour-year limit applies (old rule).NoTen-year limit in England; breach of condition is also ten years.
  4. 4Is building regulation evidence missing?
    YesSeek a regularisation certificate or indemnity insurance; do not contact the council first.NoRely on the completion or competent person certificate.
  5. A lawful development certificate (s 191) confirms immunity from enforcement.

TCPA 1990, ss 55, 57, 171B (as amended by LURA 2023); Building Act 1984

Key rules

  • Development requires planning permission (Town and Country Planning Act 1990, s 57). Development means building and other operational development or a material change of use (s 55(1)).
  • Not development: internal works not materially affecting external appearance (s 55(2)(a)), and a change of use within the same use class (s 55(2)(f)) under the Town and Country Planning (Use Classes) Order 1987. Class E (commercial, business and service) covers shops, cafés, restaurants, offices, gyms and clinics, so a shop to café change needs no permission.
  • Permitted development: Town and Country Planning (General Permitted Development) (England) Order 2015, Sch 2. Householder rights (Part 1) apply to houses, not flats. Rights can be removed by an Article 4 direction or by condition. Listed buildings and conservation areas have tighter limits.
  • Duration of permission: full permission lapses unless development begins within three years (s 91). Outline permission: reserved matters must be applied for within three years, and development must begin within two years of final approval of reserved matters (s 92).
  • Enforcement time limits (s 171B, as amended by the Levelling-up and Regeneration Act 2023 from 25 April 2024 in England):
Breach Time limit
Operational development (substantially completed on or after 25 April 2024) 10 years
Change of use to a single dwelling (on or after 25 April 2024) 10 years
Operational development substantially completed before 25 April 2024 4 years (old rule)
Any other breach, including breach of condition 10 years
Listed building works without consent No time limit
  • A lawful development certificate (s 191) confirms immunity from enforcement.
  • Listed buildings – Planning (Listed Buildings and Conservation Areas) Act 1990: works affecting character need listed building consent (s 7); unauthorised works are a criminal offence (s 9); a listed building enforcement notice (s 38) has no time limit and can be served on the current owner, so the buyer inherits the problem.
  • Building regulations – Building Act 1984 and Building Regulations 2010: evidence of compliance is a completion certificate or a competent person certificate (e.g. FENSA for windows, Gas Safe, NICEIC). If missing, the options are a regularisation certificate (reg 18), which involves inspection and opening up, or indemnity insurance. The local authority's power to require removal or alteration of non-compliant work (s 36) has been extended to ten years by the Building Safety Act 2022 for work completed after that change took effect.
  • Indemnity insurance is usually void if the local authority has been contacted about the breach, so do not approach the council before taking out a policy.
  • Conditional contracts: a developer buying land subject to planning should use a contract conditional on grant of satisfactory permission, with a long-stop date.

How it is tested

  • Change of use: is it within the same class (no development) or a material change?
  • Unauthorised extension: when was it substantially completed? Before 25 April 2024 and more than four years ago means immune; later works face a ten-year limit.
  • Missing building regulations evidence: regularisation, retrospective certificate, or indemnity insurance (without contacting the council).
  • Permitted development for a flat, a listed building or an Article 4 area.

Exam traps

  • Applying the old four-year rule to works completed in 2025. In England the limit is now ten years.
  • Thinking a breach of condition has a four-year limit. It is ten years.
  • Thinking listed building breaches become immune with time.
  • Assuming flats enjoy householder permitted development rights.
  • Advising a call to the council before obtaining indemnity insurance.

Quick check

Remember: Check when the work was done: post-25 April 2024 operational development in England has a ten-year enforcement window, and listed building breaches never become immune.

Law covered in these questions

  • Town and Country Planning Act 1990, s55(2)(f)
  • Town and Country Planning (Use Classes) Order 1987, Class E
  • Town and Country Planning Act 1990, s171B (as amended by the Levelling-up and Regeneration Act 2023)
  • Town and Country Planning Act 1990, ss 171B and 191
  • Town and Country Planning Act 1990, ss 171B(3) and 187A
  • Town and Country Planning Act 1990, s91
  • Planning (Listed Buildings and Conservation Areas) Act 1990, ss 7, 9 and 38
  • Town and Country Planning (General Permitted Development) (England) Order 2015, art 4
  • Building Act 1984, ss 35 and 36
  • Building Regulations 2010
  • Building Regulations 2010, reg 18
  • Town and Country Planning Act 1990, s92
  • Town and Country Planning (General Permitted Development) (England) Order 2015, Sch 2 Part 1 Class A
  • Law of Property (Miscellaneous Provisions) Act 1989, s2

Worked answer: 1 free sample question

Try it above first, then read the worked answer below. Members get every planning and building control question.

Question 1 · Planning and building control✓ Solicitor reviewed

Tilda is buying the freehold of a shop with a view to running a café from it. The shop has been used for the retail sale of clothes. She plans no external works. Which of the following best describes whether she needs planning permission for the change?

  1. Permission is needed, because any change from retail use to food and drink use is a material change of use.
  2. No permission is needed, as both uses fall within Class E and a change within a use class is not development.Correct answer
  3. No permission is needed, but only if she applies for a certificate of lawful use within six months of opening.
  4. No permission is needed, because a change of use without building works never amounts to development.
  5. Permission is needed, because cafés fall within a sui generis class requiring express consent in every case.

Members

11 more planning and building control questions with full answers

Unlock all 3,641 solicitor-reviewed questions, full FLK1 and FLK2 timed mocks and the practice builder. From £35, one-off, no auto-renewal.

More Property Practice topics

Back to all Property Practice questions, or sit a timed mock.

What you get

Everything you need to practise for SQE1, from £35

One-off payment, no subscription. Every question, every mock and every member tool unlocks the moment you pay.

Every subject covered

3,641 questions across all 14 SQE1 subjects and every topic in the Solicitors Regulation Authority (SRA) specification.

Built like the real exam

Five options, one single best answer, client-based scenarios: the format SQE1 uses.

The law behind every answer

Each answer cites the case or statute that decides it. Statute questions link to legislation.gov.uk.

Timed FLK1 and FLK2 mocks

Full 85-question sessions at exam pace (2 hours 33 minutes), matching the January 2027 format.

See your weak topics

Your score is tracked by topic, so your next study session goes where the marks are.

Checked by solicitors

Every question is reviewed by a team of qualified solicitors in England and Wales.

Why it matters: SQE1 costs £2,006 per attempt, and only 53% of candidates passed both papers in January 2026. A few weeks of exam-format practice costs a fraction of one resit. See pass rates.

1 month

Black Friday −30%
£35£35 £24.50one-off

£35 a month · A focused final push before your sitting.

  • All 3,641 questions with explained answers
  • Full FLK1 and FLK2 timed mocks
  • Practice builder and progress tracking
  • 30 days of access, no auto-renewal
Get 1 month for £35
Most popular

3 months

Black Friday −30%
£79£79 £55.30one-off

About £26 a month · The most popular length for one SQE1 sitting.

  • All 3,641 questions with explained answers
  • Full FLK1 and FLK2 timed mocks
  • Practice builder and progress tracking
  • 90 days of access, no auto-renewal
Get 3 months for £79

6 months

Black Friday −30%
£129£129 £90.30one-off

About £21.50 a month · Time to study steadily, sit, and resit if needed.

  • All 3,641 questions with explained answers
  • Full FLK1 and FLK2 timed mocks
  • Practice builder and progress tracking
  • 180 days of access, no auto-renewal
Get 6 months for £129
  • Solicitor-reviewed questions
  • Law cited on every answer
  • One-off payment, no auto-renewal
  • Secure Stripe checkout