HomeProperty PracticeRemedies for delay and breach

Property Practice · FLK2

Remedies for delay and breach: SQE1 notes and practice questions

Key rules, exam traps and 15 single best answer questions on remedies for delay and breach, with the answer explained and the law behind each one.

  • 3,641 SQE1 questions across all 14 subjects, in the exam's single best answer format
  • Reviewed by a team of qualified solicitors, with the case or statute behind every answer
  • Full 85-question FLK1 and FLK2 timed mocks, built for the January 2027 format
  • Progress tracked topic by topic, so you revise what you actually get wrong
  • Start free: all notes and guides plus a sample question in every topic, no card needed
  • Solicitor-reviewed questions
  • Law cited on every answer
  • One-off payment, no auto-renewal
  • Secure Stripe checkout
Full SQE1 question bank
from£35£35 £24.50one-off
Black Friday: 30% off, up to 80% on bigger basketsUnlock all 3,641 questions

No auto-renewal · instant access · or try free sample questions

Revision notes

At a glanceCompletion is late: what can the innocent party do?
  1. 1Has completion been delayed past the contractual date?
    YesThe party with the greater period of default pays compensation at the contract rate (SCS late completion condition).NoNo delay remedy; consider other breaches.
  2. 2Has the time for completion passed and is the server ready, able and willing?
    YesServe a notice to complete: 10 working days, time becomes of the essence.NoA premature or unready notice is invalid.
  3. 3Did the buyer fail to comply with the notice?
    YesSeller may rescind, forfeit the 10% deposit, resell and claim further loss, giving credit for the deposit.NoContract continues to completion.
  4. 4Did the seller fail to comply with the notice?
    YesBuyer may rescind, recover the deposit with interest and claim damages.NoSpecific performance remains available for land.
  5. Contractual compensation does not bar common law damages, but credit must be given for it.

SCS 6.8 and 9.3; Raineri v Miles [1981]; Johnson v Agnew [1980]

Key rules

  • Late completion – contractual compensation (SCS late completion condition, condition 9.3 in the 5th edition): if completion is delayed, the party whose total period of default is greater pays compensation at the contract rate on the purchase price (less any deposit paid, where the buyer pays) for the period by which their default exceeds the other's.
  • Damages at common law: a party may also claim damages for actual loss caused by delay (Raineri v Miles [1981]), but must give credit for contractual compensation received.
  • Notice to complete – SCS 6.8: once the time for completion has passed on the completion date, a party who is ready, able and willing to complete may serve notice. The recipient must complete within 10 working days (excluding the day of service), and time becomes of the essence. A seller is still "ready" if its mortgage will be cleared from the completion money. A notice served before the completion time has passed is premature and invalid.
  • Buyer fails to comply with a notice to complete: the seller may rescind, forfeit and keep the deposit (10%) with accrued interest, resell, and claim damages for further loss (credit given for the deposit). Example: price £500,000, resale £430,000, costs £5,000, deposit £50,000: loss £75,000 less £50,000 = £25,000 recoverable.
  • Seller fails to comply: the buyer may rescind, recover the deposit with accrued interest, and claim damages.
  • Return of deposit – Law of Property Act 1925, s 49(2): the court has a discretion to order repayment of a deposit, but rarely does so where the deposit is the usual 10%.
  • Specific performance: commonly granted for contracts for land because each property is unique. If the order is not obeyed, the innocent party may apply to discharge it and claim damages (Johnson v Agnew [1980]).
  • Damages measure: losses within the reasonable contemplation of the parties (Hadley v Baxendale (1854)).
  • Misrepresentation: rescission (even after completion, subject to the usual bars: affirmation, lapse of time, third-party rights, impossibility of restitution) and damages under Misrepresentation Act 1967, s 2(1). Exclusion clauses must be reasonable (s 3); see Walker v Boyle [1982].
  • Errors and omissions in the contract (SCS): damages if the error is material; rescission only if the property differs substantially from what was described, or the error was fraudulent or reckless.
  • Title guarantee covenants after completion – Law of Property (Miscellaneous Provisions) Act 1994: a buyer can sue on the implied covenants, for example that the property is free from incumbrances the seller knew or should have known of (full title guarantee). No liability for matters on the register or within the buyer's actual knowledge (s 6).
Default Main remedy
Short delay Contractual compensation at contract rate
Long delay Notice to complete, then rescission
Seller refuses to complete Specific performance or damages
False replies to enquiries Misrepresentation remedies
Post-completion title defect Title guarantee covenants

How it is tested

  • Calculate compensation: contract rate × (price minus deposit, if buyer defaults) × days.
  • Both parties late: compare periods of default; only the net excess is compensated.
  • Validity of a notice to complete (timing; seller with a mortgage still "ready").
  • Buyer defaults after notice: what can the seller keep and claim?

Exam traps

  • Charging compensation on the full price when the buyer has paid a deposit. Use the balance.
  • Thinking a seller with an outstanding mortgage cannot serve notice to complete.
  • Counting the day of service within the 10 working days.
  • Assuming the seller must return the deposit and sue for loss. The seller forfeits it and claims any excess.
  • Thinking rescission for misrepresentation is barred merely because the sale has completed.

Quick check

Remember: Delay gives compensation at the contract rate; only a notice to complete makes time of the essence and opens the door to rescission and forfeiture of the deposit.

Law covered in these questions

  • Standard Conditions of Sale (5th edn) conditions 6.3, 6.8
  • Standard Conditions of Sale (5th edition, 2018 revision), conditions 6.8 and 7.4
  • Standard Conditions of Sale (5th edition, 2018 revision), condition 6.8
  • Standard Conditions of Sale (5th edition, 2018 revision), conditions 6.8 and 7.5
  • Standard Conditions of Sale (5th edition, 2018 revision), conditions 1.1.1 and 7.2
  • Equitable remedy of specific performance
  • Johnson v Agnew [1980] AC 367
  • Standard Conditions of Sale (5th edition, 2018 revision), condition 7.2.3
  • Hadley v Baxendale (1854) 9 Exch 341
  • Law of Property (Miscellaneous Provisions) Act 1994, ss 3 and 6
  • Law of Property (Miscellaneous Provisions) Act 1994, s6
  • Law of Property Act 1925, s49(2)
  • Workers Trust & Merchant Bank Ltd v Dojap Investments Ltd [1993] AC 573
  • Misrepresentation Act 1967, s1(b)

Worked answer: 1 free sample question

Try it above first, then read the worked answer below. Members get every remedies for delay and breach question.

Question 1 · Remedies for delay and breach✓ Solicitor reviewed

Completion was due on 1 June under the Standard Conditions of Sale. The buyer pays on 8 June. Which statement best describes the seller's remedy?

  1. The seller must refund the deposit and cancel the contract.
  2. The seller may keep the property and the deposit regardless.
  3. The seller has no remedy, because time is never of the essence.
  4. The seller may sue only for the price after twelve months.
  5. Compensation for delay, which is calculated at the contract rate on the purchase price for the period of delay.Correct answer

Members

14 more remedies for delay and breach questions with full answers

Unlock all 3,641 solicitor-reviewed questions, full FLK1 and FLK2 timed mocks and the practice builder. From £35, one-off, no auto-renewal.

More Property Practice topics

Back to all Property Practice questions, or sit a timed mock.

What you get

Everything you need to practise for SQE1, from £35

One-off payment, no subscription. Every question, every mock and every member tool unlocks the moment you pay.

Every subject covered

3,641 questions across all 14 SQE1 subjects and every topic in the Solicitors Regulation Authority (SRA) specification.

Built like the real exam

Five options, one single best answer, client-based scenarios: the format SQE1 uses.

The law behind every answer

Each answer cites the case or statute that decides it. Statute questions link to legislation.gov.uk.

Timed FLK1 and FLK2 mocks

Full 85-question sessions at exam pace (2 hours 33 minutes), matching the January 2027 format.

See your weak topics

Your score is tracked by topic, so your next study session goes where the marks are.

Checked by solicitors

Every question is reviewed by a team of qualified solicitors in England and Wales.

Why it matters: SQE1 costs £2,006 per attempt, and only 53% of candidates passed both papers in January 2026. A few weeks of exam-format practice costs a fraction of one resit. See pass rates.

1 month

Black Friday −30%
£35£35 £24.50one-off

£35 a month · A focused final push before your sitting.

  • All 3,641 questions with explained answers
  • Full FLK1 and FLK2 timed mocks
  • Practice builder and progress tracking
  • 30 days of access, no auto-renewal
Get 1 month for £35
Most popular

3 months

Black Friday −30%
£79£79 £55.30one-off

About £26 a month · The most popular length for one SQE1 sitting.

  • All 3,641 questions with explained answers
  • Full FLK1 and FLK2 timed mocks
  • Practice builder and progress tracking
  • 90 days of access, no auto-renewal
Get 3 months for £79

6 months

Black Friday −30%
£129£129 £90.30one-off

About £21.50 a month · Time to study steadily, sit, and resit if needed.

  • All 3,641 questions with explained answers
  • Full FLK1 and FLK2 timed mocks
  • Practice builder and progress tracking
  • 180 days of access, no auto-renewal
Get 6 months for £129
  • Solicitor-reviewed questions
  • Law cited on every answer
  • One-off payment, no auto-renewal
  • Secure Stripe checkout